Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 06/10/2025 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 06/10/2025 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.
Cochran Boulevard at Veterans Boulevard Intersection Improvments
Last Updated: 06/10/2025 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 06/10/2025 Category: Roadway Current Phase: Construction
Gillot Blvd roadway reconstructionLast Updated: 06/10/2025 Category: Roadway Current Phase: Design Development
Widen Kings Highway to a 4 lane divided roadwayPeachland Boulevard at Harbor Boulevard Intersection Improvments
Last Updated: 06/10/2025 Category: Roadway Category: Sidewalks Current Phase: Design Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 06/10/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
The proposed pool will be 54% larger than the existing pool (140,000 vs. 65,000 gallons) and include lap lanes. To account for the increase in pool size and amenities, an increase in operating budget is included for staffing and operational needs (chemicals, utilities, equipment such as lane lines, programs, general maintenance, etc.). Due to the addition of lap swimming, the new facility will also increase operating hours to meet patron interest.
Port Charlotte Beach Recreation Center
Last Updated: 06/10/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events.Last Updated: 06/10/2025 Category: Roadway Current Phase: Design Development
Sandhill Blvd Widening